L3 DC public EVSE installation causing traffic control reroute delays @Sunset_Beach-NC (v)

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

L3 DC public EVSE installation causing traffic control reroute delays @Sunset_Beach-NC (v)

brucedp
This post has NOT been accepted by the mailing list yet.


http://www.wwaytv3.com/2017/05/09/electric-vehicle-charging-station-to-create-traffic-delays-in-sunset-beach/
Electric vehicle charging station installation to create traffic delays in Sunset Beach
2017/05/09  

[image  
http://www.wwaytv3.com/wp-content/uploads/2017/05/BEMC_ElectricVehicleChargin.jpg
Brunswick Electric Membership Corporation started installing electric vehicle charging stations in late 2015. (Photo: BEMC)
]

SUNSET BEACH, NC (WWAY) — Work to install a charging station for electric vehicles could create some traffic delays this week in Sunset Beach.

The town says crews from Brunswick Electric Membership Corporation will install the station Wednesday. It’s going in on Sunset Blvd. near Sunset Properties, the town says.

During the installation, the north bound lane of Sunset Blvd. will be closed. The town says to plan for delays or choose alternate routes to get off the island.
[© 2017 WWAY TV]



https://goo.gl/maps/7f6zAFpy94G2
Sunset Properties at Sunset Beach
Address: 419 Sunset Blvd S, Sunset Beach, NC 28468
Vacation home rental agency in Sunset Beach, North Carolina
...
[dated]
[video
https://youtu.be/rQ15GhRQ7GY
EVP Fast Charge Brunswick Forest
Brunswick Electric Membership Corporation  Jan 28, 2016
]
...
http://www.bemc.org/content/bemc-unveils-electric-vehicle-charging-stations
BEMC unveils electric vehicle charging stations
Shallotte, N.C., December 15, 2015 – Brunswick Electric Membership Corporation (BEMC)
recently installed two DC Fast Charger ‘CarPower’ electric vehicle charging stations in their service area.  There are fewer than a dozen in North Carolina, and they can charge an electric vehicle in approximately 20- 30 minutes compared to the 4 to 6 hours it takes using a standard Level 2 charger, which can be found in Wilmington and North Myrtle Beach.

BEMC CarPower’s northern location was recently installed in Brunswick Forest, on property near the development’s entrance and Port City Java. CarPower’s southern location is at Callahan’s of Calabash.  These fast charging stations are the result of the collaboration between BEMC, the manufacturer SigNet, and Nissan – North America.  Nissan is looking to expand its charger infrastructure and asked the electric cooperative to place them in well- traveled Brunswick County locations ...
http://www.bemc.org/sites/brunswickemc/files/images/Energy/15ChgStn_BF4web_400.jpg




For EVLN EV-newswire posts use:
http://evdl.org/evln/


{brucedp.neocities.org}